日本丝袜美腿一区二区三区_18禁成人网站无遮挡在线看_国产黄色网址观看_欧美综合久久久精品_国产综合另类视频_男人激烈吮乳吃奶动图_免费cba高清在线播放_亚洲婷婷六月色香综合缴情_欧洲一级a做性视频_中文字幕日本熟女

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://loveaustralia.cn/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 公司新聞

木工加工棚讓工地防護(hù)作用更明顯

來源:http://loveaustralia.cn/   發(fā)布時(shí)間:2022-05-10

加工棚主要是應(yīng)用在建筑工地上,像配電箱、鋼筋、電梯、木工、攪拌機(jī)等都需要加工棚,是一種建筑工地上的防護(hù)措施。它的使用可以說是備受關(guān)注的,那么該加工棚的防護(hù)作用怎么樣呢?
Processing shed is mainly used in construction sites, such as power distribution box, reinforcement, elevator, carpentry, mixer and so on. It is a protective and safety measure on construction sites. Its use can be said to have attracted much attention, so what is the protective effect of the processing shed?
加工棚是為了保護(hù)施工現(xiàn)場的施工人員,以鋼管為支撐架,用竹簽或竹條或廢棄模板覆蓋防砸,或通過加工棚保護(hù)高壓線等.一般的雙層保護(hù)是為了增加系數(shù)。
The processing shed is designed to protect the construction personnel on the construction site. The steel pipe is used as the support frame, covered with bamboo sticks or strips or waste formwork to prevent smashing, or the high-voltage line is protected through the processing shed The general double-layer protection is to increase the safety factor.
加工棚是施工時(shí)需要搭建的操作人員或人行通道,過往人員的加工棚需要雙層。在懸臂式腳手架上,每隔十米設(shè)置一個(gè)懸臂式視頻屏幕兜網(wǎng),可以更好地保證人們在加工棚下行走的。在施工過程中,加工棚的施工需要注意防護(hù)措施,施工人員需要按施工要求進(jìn)行施工。特別是在露天攪拌機(jī)場所、現(xiàn)場混凝土攪拌機(jī)、絞車棚、鋼棚、木棚、一些出入口、現(xiàn)場廁所等,需要設(shè)置加工棚。
The processing shed is an operator or pedestrian passage that needs to be built during construction. The processing shed of passing personnel needs to be double-layer. On the cantilever scaffold, a cantilever video screen pocket net is set every ten meters, which can better ensure the safety of people walking under the processing shed. During the construction process, the construction of the processing shed needs to pay attention to safety protection measures, and the construction personnel need to carry out the construction according to the construction requirements. Especially in the open-air mixing airport, on-site concrete mixer, winch shed, steel shed, wood shed, some entrances and exits, on-site toilet, etc., processing shed needs to be set.
在安裝和拆除水平保護(hù)裝置之前,需要進(jìn)行技術(shù)交底。高空作業(yè)人員需經(jīng)過技術(shù)培訓(xùn)和考試,持證上崗。加工棚使用的鋼管、緊固件等材料需符合相關(guān)標(biāo)準(zhǔn)的要求。在架設(shè)和拆除臥式加工大棚時(shí),操作人員的“三寶”需要齊全并正確使用。
Safety technical disclosure is required before installing and removing horizontal protection devices. Personnel working at heights shall undergo professional technical training and professional examination and work with certificates. Steel pipes, fasteners and other materials used in the processing shed shall meet the requirements of relevant standards. When erecting and dismantling the horizontal safe processing shed, the "three safety treasures" of the operators need to be complete and used correctly.
木工加工棚
加工棚架設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),作業(yè)時(shí)間要錯(cuò)開。搭建和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在距建筑物外邊緣少2m的范圍內(nèi),堆放高度不應(yīng)超過1m。拆下的材料需及時(shí)送到地面運(yùn)走,嚴(yán)禁高空拋擲。
When erecting and dismantling the processing shed, simultaneous operation up and down shall be avoided, and the operation time shall be staggered. When building and dismantling the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m. The removed materials shall be transported to the ground in time, and it is strictly prohibited to throw them from high altitude.
建造和拆除加工棚時(shí),應(yīng)在地面設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除加工棚時(shí),應(yīng)有專人指導(dǎo)。管理人員要保持眼睛、腿和嘴的勤勉,對(duì)危險(xiǎn)情況采取有效的防護(hù)措施,確保人員。
When constructing and dismantling the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor it. Special personnel shall be assigned to guide the construction and demolition of processing shed. Management personnel shall keep their eyes, legs and mouth diligent, and take effective safety protection measures for dangerous situations to ensure personnel safety.
陰雨大風(fēng)天氣,應(yīng)暫停木工加工棚的搭建和拆除,并檢查和維護(hù)加工棚的。加工大棚架設(shè)后,需經(jīng)專職員驗(yàn)收合格后方可投入使用。在豎立和拆除水平保護(hù)之前,需要進(jìn)行技術(shù)交底。
In rainy and windy weather, the construction and demolition of woodworking shed shall be suspended, and the safety of processing shed shall be inspected and maintained. After the erection of the processing shed, it can be put into use only after passing the acceptance of the full-time safety officer. Before erecting and removing horizontal protection, safety technical disclosure is required.
木工加工棚讓工地防護(hù)作用更明顯便是以上相關(guān)內(nèi)容了,當(dāng)然如果您有需求的話可以隨時(shí)通過網(wǎng)站loveaustralia.cn聯(lián)系到我們,我們制作以及出售加工棚等相關(guān)產(chǎn)品!
The woodworking shed makes the protection of the construction site more obvious. Of course, if you need it, you can go to loveaustralia.cn at any time Com contact us, we specialize in making and selling processing shed and other related products!